🚚 Free Worldwide Shipping on All Orders!Shop Now
HomeStore

PetWale Long Lead Nylon Leash for Dogs (Blue)

Product image 1
1 / 5

PetWale Long Lead Nylon Leash for Dogs (Blue)

A 14 feet long leash used by trainers to work on recall, search, fetch and for many other behavioural and professional training for your doggos.

This leash is available in 2 variants of thickness - 1" & 1.5" in width making it comfortable to hold and strong enough to train pups and large sized dogs alike.

Key Features:

  • Strong and Sturdy.
  • Rust-resistant metallic fittings make the leash washable.
  • Soft fabrics of these leashes will make walks more pleasurable.
SIZE LENGTH WIDTH DOG SIZE
Small 5 ft / 60 in 20 mm
Puppy or small breeds
Medium 5 ft / 60 in 25 mm Small or medium breeds
Large 5 ft / 60 in 38 mm Medium or large breeds


Maintenance Tip :
1. This product is not chew-proof, please keep the product away from the pet when not in use.
2. When not in use, please store the product in a dry, cool place, please prevent it from excessive heat or moisture to maximize its lifespan,
3. Handwash the product with mild soap, and not machine wash to maximize the lifespan of the product. If the product gets wet or is washed, please allow it to air dry completely before having your furry friend wear it.

A 14 feet long leash used by trainers to work on recall, search, fetch and for many other behavioural and professional training for your doggos.

This leash is available in 2 variants of thickness - 1" & 1.5" in width making it comfortable to hold and strong enough to train pups and large sized dogs alike.

Key Features:

  • Strong and Sturdy.
  • Rust-resistant metallic fittings make the leash washable.
  • Soft fabrics of these leashes will make walks more pleasurable.
SIZE LENGTH WIDTH DOG SIZE
Small 5 ft / 60 in 20 mm
Puppy or small breeds
Medium 5 ft / 60 in 25 mm Small or medium breeds
Large 5 ft / 60 in 38 mm Medium or large breeds


Maintenance Tip :
1. This product is not chew-proof, please keep the product away from the pet when not in use.
2. When not in use, please store the product in a dry, cool place, please prevent it from excessive heat or moisture to maximize its lifespan,
3. Handwash the product with mild soap, and not machine wash to maximize the lifespan of the product. If the product gets wet or is washed, please allow it to air dry completely before having your furry friend wear it.

Select Size
From $6.56
PetWale Long Lead Nylon Leash for Dogs (Blue)
$6.56

Description

A 14 feet long leash used by trainers to work on recall, search, fetch and for many other behavioural and professional training for your doggos.

This leash is available in 2 variants of thickness - 1" & 1.5" in width making it comfortable to hold and strong enough to train pups and large sized dogs alike.

Key Features:

  • Strong and Sturdy.
  • Rust-resistant metallic fittings make the leash washable.
  • Soft fabrics of these leashes will make walks more pleasurable.
SIZE LENGTH WIDTH DOG SIZE
Small 5 ft / 60 in 20 mm
Puppy or small breeds
Medium 5 ft / 60 in 25 mm Small or medium breeds
Large 5 ft / 60 in 38 mm Medium or large breeds


Maintenance Tip :
1. This product is not chew-proof, please keep the product away from the pet when not in use.
2. When not in use, please store the product in a dry, cool place, please prevent it from excessive heat or moisture to maximize its lifespan,
3. Handwash the product with mild soap, and not machine wash to maximize the lifespan of the product. If the product gets wet or is washed, please allow it to air dry completely before having your furry friend wear it.